Commercial, Industrial and Resources

Environmental assessment, approvals and compliance for mines, pipelines and industrial sites

From environmental impact assessment and approvals through to construction and operation, we help you meet your approval conditions every day of the project. We prepare impact assessments and specialist studies, survey before clearing and supervise during it, prepare species management plans and offsets, and audit your operational compliance. For QGC we wrote eight significant species management plans for the Upstream Pipeline, approved by the State and Commonwealth.

Scope

What we deliver

07 5428 6372 | 0481 848 033 | admin@greentapesolutions.com.au

  1. Environmental impact assessment, Environmental Impact Statement (EIS) terrestrial ecology inputs, constraints reporting and threatened ecological community assessments
  2. Threatened fauna surveys: trapping, acoustic monitoring and tree hollow inspection
  3. Pre-clearance surveys and reports, fauna spotting and catching, and management of animal breeding places and fauna spotter catcher registers
  4. Significant species management plans and species management programs
  5. EPBC referrals (under the Environment Protection and Biodiversity Conservation Act 1999 (Cth)) and State approvals
  6. State and National offset assessment, delivery and compliance, including offset negotiation and offset site management
  7. Threatened plant salvage, translocation and propagation, with care, monitoring, management plans and oversight, and salvage permits
  8. Construction and operational environmental management plans, environmental risk assessments, and erosion and sediment control plans and auditing
  9. Aquatic and waterway surveys, water analysis, and lighting impact assessment for wildlife
  10. Audits against EPBC Act, Environmental Authority and Council conditions, and ISO 9001 (Quality Management Systems) and 14001 audits
  11. NSW Biodiversity Assessment Method assessments
  12. Nature Repair Market assessment report and compliance

Scale and capacity

For Origin Energy we negotiated more than 500 ha of offsets inside the project footprint. On one mining project, our ecologists worked on site two to three months at a time.

Where we work

Coal and bauxite mines, gas pipelines, powerline corridors and industrial sites. Remote sites too: at Skardon River we covered land clearing and marine piling.

Specialist capability

Bare-rumped Sheathtail Bat surveys for QGC, Northern Quoll trapping and radio tracking at Mt Emerald, and microbat relocation under approved protocols at Maules Creek. We hold a Queensland Scientific Purposes Permit, Animal Ethics Approval and a General Fisheries Permit, so your fauna work is lawful from day one.

How we deliver

From your first email to compliance

  1. Send us the project area and your approval conditions, if you have them. We map what each condition requires before work starts.
  2. Environmental impact assessment, specialist studies and threatened fauna surveys to support your approvals, including EPBC referrals and State applications.
  3. Species management plans, salvage permits and offset strategies prepared for State and Commonwealth approval.
  4. Pre-clearance surveys and reports for clearing areas, with findings issued before work starts.
  5. Fauna spotting and clearing supervision on site, including remote rosters; our ecologists have stayed on site two to three months at a time.
  6. Offsets negotiated, managed and monitored, with audits against EPBC Act, Environmental Authority and Council conditions so compliance is documented through operation.

Why operators use us

Operators use us because one team covers surveys, clearing, species plans and offsets under your conditions. On one mining project we also prepared the emergency response plan and dangerous species management.

Project

Origin Energy EPBC referral and offsets

Challenge

Origin Energy's project needed EPBC approval, with offsets for the habitat of three threatened species: Koala, Collared Delma and Squatter Pigeon. Impacts had to be kept low while the work proceeded across the landholdings involved.

Solution

We carried out a pre-clearance assessment, mapped the sensitive areas and advised where seismic lines should go to avoid them. We then prepared the EPBC referral and negotiated offsets directly with the landholders.

Outcome

More than 500 ha of offsets were secured inside the project footprint. We then managed the offsets, including access tracks, weeds, pests, fire and monitoring.

Track record

Resources and industrial projects

  • Origin Energy: EPBC referral and 500+ ha of offsets for Koala, Collared Delma and Squatter Pigeon habitat
  • QGC: eight significant species management plans for the Upstream Pipeline, approved by State and Commonwealth
  • Stanwell, Meandu East: threatened ecological community assessment for the EIS
  • Bengal Coal: two seasonal EIS surveys for Northern Quoll, Koala and Little Pied Bat
  • Whitehaven, Maules Creek Coal Mine: microbat surveys and relocation
  • Metro Mining, Skardon River: fauna spotting on land and during marine piling
  • Valeria Coal and Hail Creek Mine West: pre-clearance surveys and constraints reporting
  • Energex: powerline biodiversity management plan and clearing supervision

Start your project

Mine, pipeline or industrial project?

Send us the project area and a copy of your approval conditions.

Secret Link